top of page

CONTACT

CONTACT

SPECIALIZED

ENGINEERING

Director of Electrical Engineering

314.341.9754

David Tretter

| PE

David Tretter

| PE

David Tretter

About

David has brought over 40 years of electrical engineering experience to our team. He is registered in 26 states in the U.S. He is the electrical Engineer of Record on multiple design projects, establishes electrical criteria based on the clients needs and budget, and develops precise work plans to define the Scope of Work as coordinated with the electrical contractor.

Education

Bachelor of Science in Electrical Engineering - University of Missouri  | Columbia, MO


Registrations + Certifications

Registered in the States of AL, AZ, AK, CA, CO, GA, IL, KS, KY, LA, MD, MS, MI, MN, MO, NV, NY, NC, ND, NE, OK, SD, TX, VT, WA, WV

Talk with our visionary team of engineers and designers about developing the right solutions for your next project.

CONTACT

CONTACT

Get in touch.

SPRINGFIELD CLINIC PEORIA SURGERY CENTER & RESIDENTIAL CARE CENTER 

PEORIA, IL

Electrical Engineer of Record for ambulatory surgery center and residential care center.

——



SPRINGFIELD CLINIC PEDIATRICS

SPRINGFIELD, IL | $18M

Electrical Engineer of Record for the 42,000 SF two-story pediatrics facility.

——



SPRINGFIELD CLINIC LAB FACILITY

SPRINGFIELD, IL | $17M

Electrical Engineer of Record for the 20,000 SF lab facility and 7,000 SF 3-lane drive-through facility.

——



SPRINGFIELD CLINIC SLEEP LAB

SPRINGFIELD, IL

Electrical Engineer of Record for renovation of 10,122 SF sleep lab.

——

Project Experience

NAVAL MEDICAL CENTER

SAN DIEGO, CA

Lead electrical engineer for the design/build to renovate/expand hospital surgical training laboratory into a state-of-the-art facility. The expansion will provide 2,300 SF of space for eight student surgical tables, 32 students and one instructor surgical table.

——



NELLIS AFB 

LAS VEGAS, NV

Lead electrical engineer for the design/build to renovate 278,000 SF of a 3 story 37,4000 SF medical center. The renovation is to attain a LEED silver certification. The renovation includes 5 ORs, 2 C-section suites, 6 LDRs, 8 ICU/CCU, 29 med/surg, 1 MRI, 1 CT scan, 2 Angiography suites, 1 Fluoroscopic radiology, 1 Cystoscopic radiology, 3 mammography, 6 ultrasound, 2 general radiology rooms.

——

KAISER PERMANENTE SOUTH  BAY MEDICAL CENTER  

HARBOR CITY, CA

Lead engineer for the design/build of a 274,000 SF replacement hospital with a 5kV utility service and 2 paralleled 5kV 1000kW generators, upgrade of the existing central plant to serve both the remaining existing hospital and the replacement hospital, a 4 story 98,000 SF medical office building with the 4th floor an OSHPD compliant medical surgical unit, 24 bed ICU/CCU unit, radiology suite, emergency room suite including major trauma rooms, two invasive cardiac cath labs, relocate existing 10,000 SF medical laboratory.

——

bottom of page