“Tom Grassi engineered the replacement of a chiller at the Holcomb Success Center. While performing field work for the chiller project he identified an existing problem on the chilled water loop and designed the solution. His extra effort resulted in improved performance on our system. Once on-line, the improved piping network allowed an existing chiller to be taken off-line for repairs while the new chiller handled the load of all buildings on the loop.”